2nd Cycle
  • Services
    • PV Module Testing ​
    • Get a Disposal Quote
    • Damage Analysis & Repair
    • SolarBox Logistics Solution​
  • Upcycling and Recycling Plant
    • Vision and Technology
    • Traction
    • Newsletter
  • About us
    • Team
    • Jobs
    • Mission
  • Shop
  • Blog
  • 0
  • English (US) Deutsch
  • Sign in
  • Contact
2nd Cycle
  • 0
    • Services
      • PV Module Testing ​
      • Get a Disposal Quote
      • Damage Analysis & Repair
      • SolarBox Logistics Solution​
    • Upcycling and Recycling Plant
      • Vision and Technology
      • Traction
      • Newsletter
    • About us
      • Team
      • Jobs
      • Mission
    • Shop
    • Blog
  • Sign in
  • English (US) Deutsch
  • Contact
Latest
Encapsulant & Backsheet: The Key to PV Lifespan What a High-Alpine PV Plant with 30+ Years of Operation Teaches Us
 
  • Blogs:
  • All
  • Our blog
  • PV-Modulrecycling: Warum der Status quo nicht ausreicht – und wie es besser geht
All
  • All
  • Our blog
  • PV-Modulrecycling: Warum der Status quo nicht ausreicht – und wie es besser geht
Encapsulant & Backsheet: The Key to PV Lifespan What a High-Alpine PV Plant with 30+ Years of Operation Teaches Us
Simon Prüller
Encapsulant & Backsheet: The Key to PV Lifespan What a High-Alpine PV Plant with 30+ Years of Operation Teaches Us
If you want real long-term reliability data for PV modules, you rarely get a better testbed than a mountain. On Loser near Altaussee, a PV plant commissioned by Energie AG has been operating since 198...
Jan 31, 2026 Our blog
2nd Cycle Year in Review 2025: A strong year for reuse, data, and recycling
Office
2nd Cycle Year in Review 2025: A strong year for reuse, data, and recycling
2025 was a good year for 2nd Cycle. Not loud, not exaggerated—but successful. We achieved important milestones, worked with strong partners, and saw that our approach works in practice: evaluating pho...
Dec 31, 2025 Our blog
How Wien Energie and 2nd Cycle are extending the life cycle of PV modules
Office
How Wien Energie and 2nd Cycle are extending the life cycle of PV modules
Photovoltaic modules have been considered durable capital goods for many years. However, when they are dismantled after 20 to 25 years, operators often assume that replacement and recycling are the on...
Dec 11, 2025 Our blog
Reuse instead of disposal: How LINZ AG is extending the life cycle of PV systems with 2nd Cycle
Office
Reuse instead of disposal: How LINZ AG is extending the life cycle of PV systems with 2nd Cycle
What to do with photovoltaic modules when a system has to be dismantled? Until now, the answer was usually recycling or disposal – often well before the end of their actual service life. LINZ AG has n...
Nov 27, 2025 Our blog
Why Solar Systems Lose More Power Output Than Modules
Simon Prüller
Why Solar Systems Lose More Power Output Than Modules
When talking about the service life of PV systems, the same figure almost always comes up: 👉 0.5% power loss per year. This value comes from meta-studies conducted by Fraunhofer ISE and NREL and descr...
Oct 24, 2025 Our blog
Testing PV modules: Why precise testing can make a difference of millions
Simon Prüller
Testing PV modules: Why precise testing can make a difference of millions
When a power plant is flooded In the fall of 2024, a once-in-a-century flood hit the EVN photovoltaic park in Dürnrohr. The plant, with 35,600 modules, had been in operation for just one year when it ...
Oct 16, 2025 Our blog
Has the performance of PV modules really tripled over the last ten years?
Simon Prüller
Has the performance of PV modules really tripled over the last ten years?
A fact check on efficiency, area coverage—and new challenges More and more often, we hear people say, “The performance of PV modules has tripled in recent years.” Sounds impressive—but is it really tr...
Jul 24, 2025 Our blog
Entsorgung von PV‑Modulen in Österreich – ein Überblick
Simon Prüller
Entsorgung von PV‑Modulen in Österreich – ein Überblick
1. Gesetzlicher Rahmen & Herstellerverantwortung Seit dem 1. Juli 2014 unterliegen PV‑Module in Österreich der Elektroaltgeräteverordnung (EAG‑VO) , die die EU‑WEEE‑Richtlinie umsetzt. Demnach gelten ...
Jun 8, 2025 Our blog
Declining Quality in New PV Modules: Why Quality Checks Are Crucial
Simon Prüller
Declining Quality in New PV Modules: Why Quality Checks Are Crucial
In recent years, a concerning trend has emerged in the photovoltaic industry: the quality of many new PV modules is declining. According to a study by the Fraunhofer Institute for Solar Energy Systems...
May 27, 2025 Our blog
Digitale UID für PV-Module – Warum Rückverfolgbarkeit der Schlüssel gegen illegalen E-Schrott ist
Simon Prüller
Digitale UID für PV-Module – Warum Rückverfolgbarkeit der Schlüssel gegen illegalen E-Schrott ist
Ein globales Problem: E-Schrott auf Deponien Weltweit wächst der Berg an elektronischem Abfall (E-Schrott) rasant – darunter auch immer mehr ausgediente PV-Module . Viel zu häufig landen diese Module ...
May 26, 2025 Our blog
Photovoltaik einfach erklärt – Grundlagen, Aufbau & Potenzial der Sonnenenergie
Simon Prüller
Photovoltaik einfach erklärt – Grundlagen, Aufbau & Potenzial der Sonnenenergie
Das Potenzial der Sonnenenergie Die Sonne liefert täglich eine unvorstellbare Menge an Energie zur Erde – in Form von elektromagnetischer Strahlung. Diese Energiequelle ist erneuerbar, global verfügba...
May 26, 2025 Our blog
Visuelle Sichtprüfung von PV-Modulen – Der erste Blick mit KI-Unterstützung
Simon Prüller
Visuelle Sichtprüfung von PV-Modulen – Der erste Blick mit KI-Unterstützung
Was ist die visuelle Sichtprüfung? Die visuelle Sichtprüfung ist eine der grundlegendsten, aber zugleich wichtigsten Prüfmethoden für Photovoltaik-Module – egal ob in der Produktion, im Feld oder im R...
May 26, 2025 Our blog
  • 1
  • 2
Navigation
  • Home
  • Team
  • Contact
Legal
  • Privacy
  • Impressum
Follow us
  • Linkedin
Get in touch
  • office@2ndcycle.at
  • +43 676 6771392
2nd Cycle FlexCo

Agathastraße 2-4
A-3300 Amstetten

© Copyright 2024 2nd Cycle FlexCo. All Rights Reserved.

We use cookies to provide you a better user experience on this website. Cookie Policy

Only essentials I agree