If you dismantle a working PV plant for repowering and sell the modules untested to a trader, you are in most cases handing over waste. As the operator, you stay liable until the modules are with an authorised collector or treatment operator. Testing every module before handover separates the two cleanly: tested modules become a product, defective ones go to recycling with full documentation.
The typical case
A plant built in the 2010s is still running, but new modules would yield far more from the same area. Repowering pays off and the old modules have to go. A trader offers a price per module, collects them and pays. To the operator it feels like a sale. Legally it is often something else, and the consequences stay with the operator.
Waste is what you intend to discard
Under the EU Waste Framework Directive, an object is waste when its holder discards it, intends to discard it or is required to do so. In repowering, that is the very purpose of the dismantling: making room for new modules.
A purchase price does not change this. In Tronex (C-624/17, 2019), the Court of Justice of the EU confirmed that items with a residual value can still be waste. An item escapes the waste regime only if its reuse is not merely possible but certain. A mixed consignment is assessed group by group: appliances whose functionality has not been established, or that are not protected for transport, count as waste.
Austria has spelled this out for PV. The federal environment ministry (BMLUK) states that only tested, functional PV modules intended for further use are non-waste. An untested module is therefore waste, even if it probably still works. And a batch from a repowering project almost always contains modules with failed bypass diodes, cell cracks or insulation faults that cannot be seen from the outside.
What this means for you as an operator
- Hand over to authorised operators only. The Waste Framework Directive requires the holder to have waste treated by a permitted establishment, dealer or collector. In Austria, this is § 15 AWG 2002; a trader without a waste permit (§ 24a AWG) does not qualify.
- Liability stays with you. In Austria, an operator who hands waste to an unauthorised party can be ordered to pay for its environmentally sound treatment until it is fully recovered or disposed of (§ 15(5b) with § 73 AWG). If the modules end up in the wrong place, the bill comes back to the original holder.
- Check the register. Handing over to a collector or treatment operator listed as authorised in the public register fulfils the handover duty (§ 15(5c) AWG). A quick register check before handover is the simplest safeguard.
- Keep records. Waste holders record type, quantity, origin and destination of their waste and keep these records for seven years (§ 17 AWG).
Exports: much tighter since 2025
Since 1 January 2025, waste PV modules fall under Basel entries Y49 or A1181. Exporting them from the EU to non-OECD countries is prohibited; exports to OECD countries require prior consent. Anyone shipping used modules as second-hand goods needs, under Annex VI of the WEEE Directive, a test record for every single item and adequate protection against transport damage. Without these, the shipment is treated as waste and the transport as illegal. For operators, a buyer who exports untested modules is not a defence but an additional risk.
What is likely to change from 2027
What is likely to change from 2027 From 1 January 2027, the green-list entries GC010 and GC020 for waste electrical equipment will no longer apply. Under the Commission's current draft, untreated waste equipment will then require notification and consent even for shipments within the EU, while properly treated fractions remain freely tradable. The act has not been adopted yet (as of November 2026).
The Commission has also announced its Circular Economy Act, including a revision of the WEEE Directive. A separate category for PV panels is on the agenda. The direction is clear: treatment close to the source gets easier, moving untested waste equipment gets harder.
The clean route: test before handover
- Plan early. Decide before dismantling which modules are to be reused and which recycled.
- Test every module. Visual, electrical and insulation testing with a test record per module: type, serial number, result, date and testing body.
- Hand over tested modules as a product. To a specific buyer for reuse, packed for transport, ideally upright. Our article on vertical transport explains why. zum vertikalen Transport.
- Defective modules to authorised operators. Only to registered collectors or treatment operators, after checking the register entry.
- Document everything. Keep test records, handover documents and waste records for seven years.
Where in doubt, the waste status can be clarified by the authorities; in Austria through a declaratory decision under § 6 AWG.
How we support you
2nd Cycle tests used modules automatically and documents every module with a test report. Functional modules get solid proof for reuse; defective ones go to the recycling line or to authorised partners. For you as an operator, that means legal certainty and documentation instead of liability risk.
Planning a repowering project? Talk to us, ideally before dismantling starts.
This article provides an overview and does not constitute legal advice. Legal status: 16 November 2026.